Other Details

Geophysical Lab
 
S. No. Name of the Major  Equipment Purpose/Usage
1 Ground penetrating radar (GPR) To map the civil utilities such as pipe lines, cavities, Cables, and to map near surface litho sections namely pavement, water table etc.
2 Resistivity imaging equipment To map subsurface lithologic  units particularly with reference to ground water applications and civil engineering applications.
3 Well logging Unit To estimate the geophysical properties of the water well such as resistivity of the surrounding formations
4 Shallow Seismic Unit To map fracture wave velocities of sub surface layers used for civil and ground water engineering.
5 Water level indicators To measure the ground water levels
                                 
Water Quality Lab
 
S. No. Name of the Major  Equipment Purpose/Usage
1 Automatic Absorption Spectrophotometer (AAS) To analyze heavy metals such as Arsenic, Lead, Chromium. Cadmium, Nickel, Iron, Copper and  Zinc 
2 Total Organic Carbon (TOC) To determine TOC in water samples
3 Biological oxygen Demand To quantify BoD in water sample
4 Flocculator To carry our jar test analysis.

Water Resources Modeling Lab

S. No. Name of the Major  Equipment Purpose/Usage
1 Computers  25Nos Application of remote sensing and GIS for water resources mapping, monitoring, modeling and assessment
2 Visual Modflow – 1 To map aquifer zones in the given study area.
3 GPS – 5 No.s To record latitude and longitudes of the location
4 Spectro Radiometer For hyper-spectral remote sensing  research purpose

Rainwater Harvesting Lab

S. No Name of the Major  Equipment No. of Structures Purpose/Usage
1 One lakh liters along with two recharge shafts 03 To store and recharge roof top rainwater
2 fifty thousand liters along with one recharge shaft 02 To store and recharge roof top rainwater
3 Two lakh litres for storage 01 To store and use for domestic purpose
4 Rainwater recharge pond with two recharge shafts 03 To recharge surplus runoff
5 Recharge pond with three recharge shafts 01 To recharge surplus runoff
6 Recharge pond with one recharge shaft 01 To recharge surplus runoff
7 Pizometers 03 To measure daily water levels.
8 Recharge shafts 23 To connect to aquifers

Various Government agencies visited

1.Central University, Hyderabad
2.ESCI, Hyderabad
3.IIT Hyderabad
4.IOCL, Kadapa
5.Ordinance Factory, Medak
6.TTD, Tirupathi
7.APARD, Hyderabad
8.EEI Rajendranagar 
9.Sri Venkateswara University, Tirupathi
10.RWS engineers, Govt of TS
11.RWS(Rural water supply) engineers, Govt of AP